-
Skip to content
Inovatif, Berkepribadian dan Mandiri
facebook
youtube
instagram
Program Studi Teknik Industri Terbaik di Medan Sumatera Utara yang Merupakan Jurusan dari Fakultas Favorit di Sumut Yaitu Fakultas Teknik UMA
Call Support 0812-1971-4223
Email Support [email protected]
Location Jalan Kolam No. 1 Medan Estate
Jalan PBSI No. 1 Medan Estate
  • HOME
  • PROFIL
    • AKREDITASI
    • FUNGSIONARIS
    • STRUKTURAL
    • VISI, MISI dan TUJUAN
  • AKADEMIK
    • INFORMASI AKADEMIK
      • AKADEMIK ONLINE
      • E-LEARNING
      • JURNAL TEKNIK INDUSTRI
    • JADWAL AKADEMIK
      • JADWAL KULIAH
      • JADWAL PRAKTIKUM
      • JADWAL KRS
      • JADWAL SEMESTER ANTARA
      • JADWAL UJIAN
        • UTS
        • UAS
      • JADWAL WISUDA
      • JADWAL SEMINAR/SIDANG
    • KALENDER AKADEMIK
    • KURIKULUM
  • AKTIVITAS PRODI
    • KEGIATAN PRODI
    • PRESTASI PRODI
  • MAHASISWA
    • BEASISWA
      • SYARAT DAN KETENTUAN PENERIMA KIP KULIAH
      • BEASISWA BANK INDONESIA (BI)
      • Beasiswa YPHAS Bagi Siswa/I Yang Berprestasi di Sekolah (Ranking I, II dan III)
      • Beasiswa YPHAS Bagi Mahasiswa/I Bersaudara Kandung
    • SISTEM INFORMASI
      • APIK
      • OPAC
      • WEBMAIL
      • DATA MAHASISWA
      • BLOG MAHASISWA
      • JURNAL MAHASISWA
      • AOC
      • ELEARNING
    • PRESTASI MAHASISWA
  • DOSEN
    • PENASEHAT AKADEMIK
    • BLOG DOSEN
    • AKTIVITAS DOSEN
    • PRESTASI DOSEN
    • JURNAL DOSEN
    • AOC
    • DOSEN PRODI
    • TKTD
    • ELEARNING
    • WEBMAIL
    • OPAC
  • ALUMNI
    • TRACER STUDY
    • DATA ALUMNI
    • LAYANAN ALUMNI
    • AKTIVITAS ALUMNI
    • PRESTASI ALUMNI
  • LABORATORIUM
    • INFORMASI LABORATORIUM
    • APLIKASI LABORATORIUM
  • ARSIP
    • SK Mahasiswa
    • DOKUMEN
    • PENGUMUMAN
  • HUBUNGI KAMI

A Practical, Cost Effective and Sustainable Option

Posted on 4 December 202029 December 2022 by industri
0

Rubblization approach has been extensively used to repair the broken concrete pavement and has confirmed a success in developed nations like the US and Europe. It has not been completely followed in developing vicinity like the center East and this paper presents the layout and Cost Effective creation demanding situations posed even as assessing damaged concrete runway in empty sector of Saudi Arabia. a number of design options for upkeep for runway pavement were considered and rubblization turned into chosen as a favored alternative for restore. This paper consists of the attention for the assessment and adoption of the concrete rubblized modulus cost using the falling weight deflectometer, optimization of the tests for the whole runway the usage of the Heavy Weight Deflectometer HWD checking out to update pits, safely working around the utilities, reasonable assumption of drop peak of the pavement and installation of software conduits in the rubblized layer. Findings of the paper demonstrates resolving technical problems which are not very well blanketed within the Federal Aviation Authority (FAA) EB-sixty six such as the extra take a look at strips, minimal areas of rubblization for assessment the usage of take a look at pits, drop in the height of concrete floor and fixing of utilities in rubblized pavement. The case examine demonstrates that the rubblization can be efficiently Cost Effective finished in far off places like empty sector of Saudi Arabia with cautiously completed targeted website online investigations, adopting correct assumed design rubblization modulus, exceptional manipulate the use of HWD, protection of utilities at the same time as rubblizing and use of polymer changed asphalt for a hit challenge deployment.
Rehabilitation of present pavement is one of the best pavement priorities dealing with transportation and aviation industry because of growing old current and broken pavement infrastructure. using warm-mix asphalt (HMA) overlays presents an extended-term Cost Effective and inexpensive strategy to the pavement rehabilitation challenge. HMA overlays growth the structural potential of the present pavement machine and improve the long-time period functional pavement overall performance along with ride, noise discount, splash and spray, friction, and popular appearance.

Rubblization includes breaking the concrete pavement into portions. The sizes of the broken portions usually variety from sand length to 75 mm (3 in.) at the surface and 305 to 381 mm (12 to 15 in.) on the bottom of the rubblized layer. The rubblized % layer behaves like a 86f68e4d402306ad3cd330d005134dac granular base layer and responds as an interlocked unbound layer reducing the existing p.c to a cloth comparable to a high power aggregate base route. This lack of structure must be accounted for within the HMA overlay layout thickness as established on this challenge a complete of a hundred and twenty,000 m2 concrete pavement changed into rubblized, along with the taxiway regions [1].

Rubblization offers a fee-powerful approach to restore the present pavement and enlarge the lifestyles of the pavement to a similarly 20 or 40 years primarily based at the design criteria. It addresses the difficulty of reflective cracking, which is a major concern while using overlay construction over inflexible pavements. A rubblization manner became executed to restore an airfield pavement at one among Saudi Aramco’s aviation facilities, which Cost Effective has served its beneficial existence.

The research gives information of an airfield rehabilitation task in which an existing pavement was damaged because of non-stop loading and environmental elements. The pavement served its supposed design life of two decades. preserving the pavement became impractical and also costly. The goal of this studies is to boom the notice of rubblization generation within the nation of Saudi Arabia and extensively in the middle East when it comes to the feasibility, thickness design/cloth characterization, high-quality guarantee Cost Effective criteria and techniques, creation/system and demanding situations faced. similarly, extra quality controls tests are proposed to be covered in the FAA Engineering quick (EB) sixty six “Rubblized Portland Cement Concrete Base route” to ensure that the evaluation includes the use of non-destructing and green strategies like Heavy Weight Deflectometer (HWD) and the sieve evaluation in preference to simplest relying on the test pit and strip only [2].

 

View this post on Instagram

 

A post shared by Teknik Industri UMA (@industri.uma)

Berita
Wisuda Periode I Tahun 2026: Rektor UMA Tekankan Lulusan Harus Mampu Hadapi Perubahan di Era Transformasi Digital
Universitas Medan Area (UMA) kembali menegaskan komitmennya dalam mencetak sumber...
Rektor Universitas Medan Area Buka PMDK Periode 1 Tahun 2026, Bekali Calon Wisudawan Hadapi Dunia Kerja Digital
Universitas Medan Area (UMA) melalui Biro Pengembangan Inovasi dan Karir...
IMTI Prodi Teknik Industri UMA Gelar Workshop Manajemen Mutu ISO 9001: Bekal Karier Profesional bagi Mahasiswa
Medan, 2026 – Dalam upaya meningkatkan kompetensi dan daya saing mahasiswa...

KAITAN UMA

LOKASI FAKULTAS TEKNIK UMA

KAMPUS I :

Jln. Kolam Nomor 1 Medan Estate
Jln. PBSI, Medan 20223
Telepon : (061) 7360168
Call Center : 0811-6013-888

KAMPUS II :

Jln. Sei Serayu No. 70 A, Medan 20122
Jln. Setia Budi No. 79 B, Medan 20122
Telepon : (061) 42402994
Call Center : 0811-6013-888

Silahkan kunjungi juga website Prodi :

  • Teknik Sipil : sipil.uma.ac.id
  • Teknik Elektro : elektro.uma.ac.id
  • Teknik Mesin : mesin.uma.ac.id
  • Arsitektur : arsitektur.uma.ac.id
  • Teknik Informatika : informatika.uma.ac.id

 

Copyright © 2016 - 2026 Prodi Teknik Industri- Universitas Medan Area