Catastrophic Formation - Program Studi Teknik Industri Terbaik di Medan Sumatera Utara yang Merupakan Jurusan dari Fakultas Favorit di Sumut Yaitu Fakultas Teknik UMA
Skip to content
Inovatif, Berkepribadian dan Mandiri
facebook
youtube
instagram
Program Studi Teknik Industri Terbaik di Medan Sumatera Utara yang Merupakan Jurusan dari Fakultas Favorit di Sumut Yaitu Fakultas Teknik UMA
Call Support 0812-1971-4223
Email Support [email protected]
Location Jalan Kolam No. 1 Medan Estate
Jalan PBSI No. 1 Medan Estate
  • HOME
  • PROFIL
    • AKREDITASI
    • FUNGSIONARIS
    • STRUKTURAL
    • VISI, MISI dan TUJUAN
  • AKADEMIK
    • INFORMASI AKADEMIK
      • AKADEMIK ONLINE
      • E-LEARNING
      • JURNAL TEKNIK INDUSTRI
    • JADWAL AKADEMIK
      • JADWAL KULIAH
      • JADWAL PRAKTIKUM
      • JADWAL KRS
      • JADWAL SEMESTER ANTARA
      • JADWAL UJIAN
        • UTS
        • UAS
      • JADWAL WISUDA
      • JADWAL SEMINAR/SIDANG
    • KALENDER AKADEMIK
    • KURIKULUM
  • AKTIVITAS PRODI
    • KEGIATAN PRODI
    • PRESTASI PRODI
  • MAHASISWA
    • BEASISWA
      • SYARAT DAN KETENTUAN PENERIMA KIP KULIAH
      • BEASISWA BANK INDONESIA (BI)
      • Beasiswa YPHAS Bagi Siswa/I Yang Berprestasi di Sekolah (Ranking I, II dan III)
      • Beasiswa YPHAS Bagi Mahasiswa/I Bersaudara Kandung
    • SISTEM INFORMASI
      • APIK
      • OPAC
      • WEBMAIL
      • DATA MAHASISWA
      • BLOG MAHASISWA
      • JURNAL MAHASISWA
      • AOC
      • ELEARNING
    • PRESTASI MAHASISWA
  • DOSEN
    • PENASEHAT AKADEMIK
    • BLOG DOSEN
    • AKTIVITAS DOSEN
    • PRESTASI DOSEN
    • JURNAL DOSEN
    • AOC
    • DOSEN PRODI
    • TKTD
    • ELEARNING
    • WEBMAIL
    • OPAC
  • ALUMNI
    • TRACER STUDY
    • DATA ALUMNI
    • LAYANAN ALUMNI
    • AKTIVITAS ALUMNI
    • PRESTASI ALUMNI
  • LABORATORIUM
    • INFORMASI LABORATORIUM
    • APLIKASI LABORATORIUM
  • ARSIP
    • SK Mahasiswa
    • DOKUMEN
    • PENGUMUMAN
  • HUBUNGI KAMI

Catastrophic Formation

Posted on 6 July 202014 December 2022 by industri
0

With the exploitation of resources accelerated to deep, the geological environment which is “3 tenors one disturbance” of rock mass in first rate depth has been Catastrophic Formation more complicated, resulting in a few new engineering geological failures, consisting of rock burst, strain bumping, massive deformation of surrounding rock, brittle-ductile transition of rock and zonal disintegration of rock mass, which occur regularly in deep underground engineering rock mass. The effect load as a result of collision, explosion, extrusion and outburst is the basis cause of the dynamic instability of the deep rock mass. What ought to be Catastrophic Formation emphasized is that excessive in-situ pressure and blasting excavation disturbance complicate disaster developing mechanism of deep underground engineering rock mass and sharply increase the problem of controlling disaster. This paper is geared toward the research repute and improvement fashion, of which dynamic characteristics of deep high pressure rock mass and its harm and failure impact each other below impact, and behavior analysis, in the later degree wherein i might talk how to perform the response law of the deep high–strain rock mass under the effect load and the mechanism of disaster developing, that is of exquisite Catastrophic Formation importance to construct a model of instability and fracture evolution about deep rock mass under shock disturbance and to keep its protection and balance.
With the rapid improvement of industrialization, the country wide monetary development has extended the dependence for resources and electricity. attributable to exhaustion of shallow mineral assets, the exploitation maintains to transport deeper into the earth and people expect to explore the underground area resources. In terms of useful resource exploitation, as well as presently, the intensity of coal mining has reached 1500 m, geothermal mining extra than 3000 m, non-ferrous over 4350 m, and as to grease and gas assets, it has reached to 7500 m. within the destiny, deep mining becomes the new regular [1] . since the rock mass deep excavated is within the complicated geological surroundings of high crustal stress, high earth temperature, excessive karst water stress and robust mechanical excavation, blasting vibration, effect unloading and mining disturbance, which is under the threats of severe dynamic phenomena as a kingdom of “3 tenors one disturbance”, and it make its mechanical reaction of deep rock mass glaringly wonderful from that of the shallow rock mass.

at some stage in the excavation of deep rock mass, the engineering catastrophe problems are emerging; there are a few new engineering geological disasters, together with rock burst, impulse earth pressure, massive deformation of surrounding rock, brittle transition of rock and zonal disintegration of rock mass in deep underground engineering rock. inside the process Catastrophic Formation of deep rock excavation, the excavation rock now not most effective bears the high static load, however also bears the have an impact on of dynamic masses which includes blasting vibration, so the strain condition isn’t like the shallow rock mass. similarly to the shallow rock shallow overburden, the unnoticed self weight strain may be excavation; most effective truely take into account the blasting vibration resulting from dynamic load, can higher remedy the problems underneath the rock dynamics. For similar to the deep excavation, if we observe the shallow solution, the effect isn’t always ideal; therefore the mechanics of deep rock reaction traits and catastrophe evolution conduct are the maximum hard and recognition of the have a look at for rock mechanics circle.

however, deep underground engineering excavation, inclusive of mining, tunnel excavation, high–velocity effect, piling and explosion protection, and civil air protection projects non-public protection, are worried into the rock dynamic troubles of dynamic mechanical houses and dynamic failure underneath impact loading [2] . effect masses due to which collision, explosion, extrusion Catastrophic Formation and outburst, are the origins of inducing deep rock mass to the touch off catastrophic instability and result in dynamic disaster. high floor strain and blasting excavation disturbance complicate the disaster growing mechanism of underground engineering rock mass in extraordinary intensity, and enhance the issue of catastrophe control. The rock mass inside the deep underground engineering could be destroyed and disturbed in a exceptional volume if the blasting method is inappropriate or the blasting vibration impact is just too high, main to dynamic instability, engendering large deformation, fracture, weigh down and basic instability, more excessive, it’s going to motive engineering disaster. consequently, to be able to efficiently control the rock mass in deep underground engineering, it’s far important to grasp the structural characteristics and mechanical properties of the deep excessive stress rock mass, systematically examine the delivery regulation, deformation mechanism and failure mode of deep surrounding rock below effect masses, discovered out the catastrophic incubation mechanism, strain evolution regulation and impact dynamic reaction of deep excessive pressure power storage rock mass underneath strong impact disturbance, set up the time-space evolution model of deformation, instability, fracture and disaster precipitated via deep excessive strain rock mass under effect loads. this is of exquisite theoretical significance and engineering cost to study and predict the catastrophic mechanism of deep high stress rock mass underneath impact disturbance.

 

View this post on Instagram

 

A post shared by Teknik Industri UMA (@industri.uma)

Berita
Wisuda Periode I Tahun 2026: Rektor UMA Tekankan Lulusan Harus Mampu Hadapi Perubahan di Era Transformasi Digital
Universitas Medan Area (UMA) kembali menegaskan komitmennya dalam mencetak sumber...
Rektor Universitas Medan Area Buka PMDK Periode 1 Tahun 2026, Bekali Calon Wisudawan Hadapi Dunia Kerja Digital
Universitas Medan Area (UMA) melalui Biro Pengembangan Inovasi dan Karir...
IMTI Prodi Teknik Industri UMA Gelar Workshop Manajemen Mutu ISO 9001: Bekal Karier Profesional bagi Mahasiswa
Medan, 2026 – Dalam upaya meningkatkan kompetensi dan daya saing mahasiswa...

KAITAN UMA

LOKASI FAKULTAS TEKNIK UMA

KAMPUS I :

Jln. Kolam Nomor 1 Medan Estate
Jln. PBSI, Medan 20223
Telepon : (061) 7360168
Call Center : 0811-6013-888

KAMPUS II :

Jln. Sei Serayu No. 70 A, Medan 20122
Jln. Setia Budi No. 79 B, Medan 20122
Telepon : (061) 42402994
Call Center : 0811-6013-888

Silahkan kunjungi juga website Prodi :

  • Teknik Sipil : sipil.uma.ac.id
  • Teknik Elektro : elektro.uma.ac.id
  • Teknik Mesin : mesin.uma.ac.id
  • Arsitektur : arsitektur.uma.ac.id
  • Teknik Informatika : informatika.uma.ac.id

 

Copyright © 2016 - 2026 Prodi Teknik Industri- Universitas Medan Area