Method for Estimating of Construction Cost of a Building Based on Previous Experiences -
Skip to content
Inovatif, Berkepribadian dan Mandiri
facebook
youtube
instagram
Program Studi Teknik Industri Terbaik di Medan Sumatera Utara yang Merupakan Jurusan dari Fakultas Favorit di Sumut Yaitu Fakultas Teknik UMA
Call Support 0812-1971-4223
Email Support [email protected]
Location Jalan Kolam No. 1 Medan Estate
Jalan PBSI No. 1 Medan Estate
  • HOME
  • PROFIL
    • AKREDITASI
    • FUNGSIONARIS
    • STRUKTURAL
    • VISI, MISI dan TUJUAN
  • AKADEMIK
    • INFORMASI AKADEMIK
      • AKADEMIK ONLINE
      • E-LEARNING
      • JURNAL TEKNIK INDUSTRI
    • JADWAL AKADEMIK
      • JADWAL KULIAH
      • JADWAL PRAKTIKUM
      • JADWAL KRS
      • JADWAL SEMESTER ANTARA
      • JADWAL UJIAN
        • UTS
        • UAS
      • JADWAL WISUDA
      • JADWAL SEMINAR/SIDANG
    • KALENDER AKADEMIK
    • KURIKULUM
  • AKTIVITAS PRODI
    • KEGIATAN PRODI
    • PRESTASI PRODI
  • MAHASISWA
    • BEASISWA
      • SYARAT DAN KETENTUAN PENERIMA KIP KULIAH
      • BEASISWA BANK INDONESIA (BI)
      • Beasiswa YPHAS Bagi Siswa/I Yang Berprestasi di Sekolah (Ranking I, II dan III)
      • Beasiswa YPHAS Bagi Mahasiswa/I Bersaudara Kandung
    • SISTEM INFORMASI
      • APIK
      • OPAC
      • WEBMAIL
      • DATA MAHASISWA
      • BLOG MAHASISWA
      • JURNAL MAHASISWA
      • AOC
      • ELEARNING
    • PRESTASI MAHASISWA
  • DOSEN
    • PENASEHAT AKADEMIK
    • BLOG DOSEN
    • AKTIVITAS DOSEN
    • PRESTASI DOSEN
    • JURNAL DOSEN
    • AOC
    • DOSEN PRODI
    • TKTD
    • ELEARNING
    • WEBMAIL
    • OPAC
  • ALUMNI
    • TRACER STUDY
    • DATA ALUMNI
    • LAYANAN ALUMNI
    • AKTIVITAS ALUMNI
    • PRESTASI ALUMNI
  • LABORATORIUM
    • INFORMASI LABORATORIUM
    • APLIKASI LABORATORIUM
  • ARSIP
    • SK Mahasiswa
    • DOKUMEN
    • PENGUMUMAN
  • HUBUNGI KAMI

Method for Estimating of Construction Cost of a Building Based on Previous Experiences

Posted on 16 March 202014 December 2022 by industri
0

In a real estate task, the estimated fee of construction and the revenues normally represent collectively the maximum Previous Experiences critical values of its feasibility look at. when a choice of project a venture is made, regularly there are few definitions of what is ready to be constructed, and often now not sufficient to make certain the accuracy of the predicted charges. considering a global tendency on decreasing margins of return over the actual property markets, mild variations of the construction fee can jeopardize the success of the entire real estate employer and even the financial stability of the builder or of the developer. this article goals at presenting a way of estimating the constructing creation fees relevant at the stage of Previous Experiences feasibility studies, being capable of offer suitable errors.
The decisions of buying land and wearing out firms are crucial for the actual estate corporations. those selections have to be grounded by way of dynamic feasibility studies. Small variations within the price of a production may endanger the profitability of organisations. The economic end result of a single organization can determine the continuity, the growth or even the financial ruin of a developer or a creation organisation.

in keeping with Gonçalves (2014) [1] , in Brazil, the net margin of real estate organisations varies among 9% and 13% of its revenue (wellknown sales price-GSV) even as the cost of its production degrees from forty% to 50% of GSV. In a hypothetical state of affairs, five% of mistakes on a construction price estimation, if related to additional overcosts of other five% due to inefficiency in the production process, can take the full variations inside the fee of the development to round 10%, accounting for approximately 5% of the revenue (GSV) and Previous Experiences finally involving greater than 50% of the net margin: a totally undesirable but yet feasible or even not unusual situation.

considering the urge with which maximum of real property investment choices want to be taken, it’s far predicted that the construction charges estimation can be quick supplied most effective on the basis of both architectural have a look at or from legal initiatives even earlier than construction has been completely studied, designed, distinctive and detailed. Smith (2007) [2] states that:

The primary characteristic of approximate estimating is to provide a forecast of the possibly value of a Previous Experiences future venture, before the constructing has been designed in element and contract details prepared. in this manner the building customer is made aware about his likely economic commitments before great layout work is undertaken.

Estimators have the responsibility and the difficult function of basing the maximum critical commercial enterprise selections whilst there is nevertheless little or no statistics available.

the present method became based totally on 30 residential commercial actual property organisations, built Previous Experiences among the years of 2004 and 2015 by means of the equal construction and improvement company within the metropolitan region of Rio de Janeiro. The approach combines elements of parametric and analogical estimation strategies, always presenting extra accurate estimates than only the parametric or analogical strategies. This technique goals at enjoyable the need of accuracy and swiftness in the production cost estimation whilst little or no records is to be had. The method requires a few preceding production enjoy to start the databank of prepared records and evolves with the boom of revel in.

 

View this post on Instagram

 

A post shared by Teknik Industri UMA (@industri.uma)

Berita
Wisuda Periode I Tahun 2026: Rektor UMA Tekankan Lulusan Harus Mampu Hadapi Perubahan di Era Transformasi Digital
Universitas Medan Area (UMA) kembali menegaskan komitmennya dalam mencetak sumber...
Rektor Universitas Medan Area Buka PMDK Periode 1 Tahun 2026, Bekali Calon Wisudawan Hadapi Dunia Kerja Digital
Universitas Medan Area (UMA) melalui Biro Pengembangan Inovasi dan Karir...
IMTI Prodi Teknik Industri UMA Gelar Workshop Manajemen Mutu ISO 9001: Bekal Karier Profesional bagi Mahasiswa
Medan, 2026 – Dalam upaya meningkatkan kompetensi dan daya saing mahasiswa...

KAITAN UMA

LOKASI FAKULTAS TEKNIK UMA

KAMPUS I :

Jln. Kolam Nomor 1 Medan Estate
Jln. PBSI, Medan 20223
Telepon : (061) 7360168
Call Center : 0811-6013-888

KAMPUS II :

Jln. Sei Serayu No. 70 A, Medan 20122
Jln. Setia Budi No. 79 B, Medan 20122
Telepon : (061) 42402994
Call Center : 0811-6013-888

Silahkan kunjungi juga website Prodi :

  • Teknik Sipil : sipil.uma.ac.id
  • Teknik Elektro : elektro.uma.ac.id
  • Teknik Mesin : mesin.uma.ac.id
  • Arsitektur : arsitektur.uma.ac.id
  • Teknik Informatika : informatika.uma.ac.id

 

Copyright © 2016 - 2026 Prodi Teknik Industri- Universitas Medan Area