Flow Assurance in Subsea Pipeline Design for Transportation of Petroleum Products -
Skip to content
Inovatif, Berkepribadian dan Mandiri
facebook
youtube
instagram
Program Studi Teknik Industri Terbaik di Medan Sumatera Utara yang Merupakan Jurusan dari Fakultas Favorit di Sumut Yaitu Fakultas Teknik UMA
Call Support 0812-1971-4223
Email Support [email protected]
Location Jalan Kolam No. 1 Medan Estate
Jalan PBSI No. 1 Medan Estate
  • HOME
  • PROFIL
    • AKREDITASI
    • FUNGSIONARIS
    • STRUKTURAL
    • VISI, MISI dan TUJUAN
  • AKADEMIK
    • INFORMASI AKADEMIK
      • AKADEMIK ONLINE
      • E-LEARNING
      • JURNAL TEKNIK INDUSTRI
    • JADWAL AKADEMIK
      • JADWAL KULIAH
      • JADWAL PRAKTIKUM
      • JADWAL KRS
      • JADWAL SEMESTER ANTARA
      • JADWAL UJIAN
        • UTS
        • UAS
      • JADWAL WISUDA
      • JADWAL SEMINAR/SIDANG
    • KALENDER AKADEMIK
    • KURIKULUM
  • AKTIVITAS PRODI
    • KEGIATAN PRODI
    • PRESTASI PRODI
  • MAHASISWA
    • BEASISWA
      • SYARAT DAN KETENTUAN PENERIMA KIP KULIAH
      • BEASISWA BANK INDONESIA (BI)
      • Beasiswa YPHAS Bagi Siswa/I Yang Berprestasi di Sekolah (Ranking I, II dan III)
      • Beasiswa YPHAS Bagi Mahasiswa/I Bersaudara Kandung
    • SISTEM INFORMASI
      • APIK
      • OPAC
      • WEBMAIL
      • DATA MAHASISWA
      • BLOG MAHASISWA
      • JURNAL MAHASISWA
      • AOC
      • ELEARNING
    • PRESTASI MAHASISWA
  • DOSEN
    • PENASEHAT AKADEMIK
    • BLOG DOSEN
    • AKTIVITAS DOSEN
    • PRESTASI DOSEN
    • JURNAL DOSEN
    • AOC
    • DOSEN PRODI
    • TKTD
    • ELEARNING
    • WEBMAIL
    • OPAC
  • ALUMNI
    • TRACER STUDY
    • DATA ALUMNI
    • LAYANAN ALUMNI
    • AKTIVITAS ALUMNI
    • PRESTASI ALUMNI
  • LABORATORIUM
    • INFORMASI LABORATORIUM
    • APLIKASI LABORATORIUM
  • ARSIP
    • SK Mahasiswa
    • DOKUMEN
    • PENGUMUMAN
  • HUBUNGI KAMI

Flow Assurance in Subsea Pipeline Design for Transportation of Petroleum Products

Posted on 9 March 202014 December 2022 by industri
0
Transportation of petroleum merchandise through pipeline gives Petroleum Products tremendous risks such as wax formation and deposition as a result of heat loss of fluids, which is dangerous to the float because of the decreased internal diameter or completely blocked pipelines in excessive cases. The manufacturing interruption because of blocked pipelines can cause enormous monetary loss. consequently, so one can decrease those negative outcomes, it’s far critical that pipeline design for waft warranty need to be considered. go with the flow guarantee is a rather new subject in oil and fuel enterprise, it approach that the go with the flow of hydrocarbon movement from one point to some other have to be ensured successfully and economically. despite the fact that glide guarantee is extremely numerous, encompassing many discrete and specialized subjects and bridging throughout the overall gamut of engineering disciplines, our work focused mainly on the have a look at of Petroleum Products wax deposit in the pipelines. the main motive of this paper is to awareness on the aspect of material in pipeline design and the selection of thermal insulation coatings. moreover, running parameters together with strain, temperature and flowrate might be tested to attain ultimate consequences. For the case examine on this paper, the pipeline connecting Ca NguVang Oilfield’s Wellhead Platform (WHP) to the principal Processing Platform of Bach Ho Oilfield (CPP-three) in Vietnam might be studied. consequently, this paintings covers numerous factors, namely the theoretical observe, the modeling the use of Excel in addition to using specialized software OLGA, and finally the software for a real case within the petroleum industry in Vietnam.
Oil and fuel fields in Vietnam are placed loads of kilometers Petroleum Products offshore wherein generating and processing methods are separated and conducted on exclusive structures. those structures are related by way of a pipeline gadget lying at the seabed. in particular, crude oil is transferred from the Wellhead Platform of Ca NguVang discipline to the important Processing Platform of Bach Ho discipline, in which crude oil is below processing, by using the about-25-kilometer-length pipeline (parent 1).

Ca NguVang subject is operated by using Hoan Vu Joint running organization. due to a median reserve, which levels between 6200 – 20,000 barrels/day [1] , it’s miles impossible to expand this discipline independently because of Petroleum Products economic troubles. with a view to minimize the development cost, it’s miles cautioned that Ca NguVang discipline must be connected with Bach Ho area by the subsea pipeline machine. The produced oil from Ca NguVang discipline has a high concentration of paraffin, which tends to cause wax deposition in pipes.

Crude oil is a combination of waxes, aromatics, naphthenes, asphaltenes, and resins. At normal reservoir temperatures and strain, wax molecules are dissolved within the crude oil. as the produced oil flows via a subsea pipeline lying on the sea floor, its temperature drops beneath WAT (Wax look Temperature) due to warmness loss alongside the pipeline [2] . Waxes in the oil form deposits at the inner pipe wall then come to be thicker Petroleum Products with time, which ends up in severe issues associated with flow assurance [3] . within the worst-case state of affairs, the complete process of transport have to be stopped for the substitute of the plugged section of the pipe. The anticipated fee might be up to approximately $30,000,000 in step with incident [4] .

In reality, there have been some of accidents associated with go with the flow warranty which become attributed to wax deposition. From 1992 to 2002, over 50 cases of pipeline blocking due to wax deposition had been stated in Gulf of Mexico [5] . wherein, the changing fee became $five,000,000, with a downtime of forty days constituted approximately $25,000,000 [6] . one of the most extreme cases occurred at Staffa discipline in North Sea, uk [7] . The offshore platform became extraordinarily damaged by way of wax deposition; to the factor that it turned into left abandoned at the whole cost of $a hundred,000,000 [6] .

 

View this post on Instagram

 

A post shared by Teknik Industri UMA (@industri.uma)

Berita
Wisuda Periode I Tahun 2026: Rektor UMA Tekankan Lulusan Harus Mampu Hadapi Perubahan di Era Transformasi Digital
Universitas Medan Area (UMA) kembali menegaskan komitmennya dalam mencetak sumber...
Rektor Universitas Medan Area Buka PMDK Periode 1 Tahun 2026, Bekali Calon Wisudawan Hadapi Dunia Kerja Digital
Universitas Medan Area (UMA) melalui Biro Pengembangan Inovasi dan Karir...
IMTI Prodi Teknik Industri UMA Gelar Workshop Manajemen Mutu ISO 9001: Bekal Karier Profesional bagi Mahasiswa
Medan, 2026 – Dalam upaya meningkatkan kompetensi dan daya saing mahasiswa...

KAITAN UMA

LOKASI FAKULTAS TEKNIK UMA

KAMPUS I :

Jln. Kolam Nomor 1 Medan Estate
Jln. PBSI, Medan 20223
Telepon : (061) 7360168
Call Center : 0811-6013-888

KAMPUS II :

Jln. Sei Serayu No. 70 A, Medan 20122
Jln. Setia Budi No. 79 B, Medan 20122
Telepon : (061) 42402994
Call Center : 0811-6013-888

Silahkan kunjungi juga website Prodi :

  • Teknik Sipil : sipil.uma.ac.id
  • Teknik Elektro : elektro.uma.ac.id
  • Teknik Mesin : mesin.uma.ac.id
  • Arsitektur : arsitektur.uma.ac.id
  • Teknik Informatika : informatika.uma.ac.id

 

Copyright © 2016 - 2026 Prodi Teknik Industri- Universitas Medan Area