Flow Assurance in Subsea Pipeline Design for Transportation of Petroleum Products -
Skip to content
Inovatif, Berkepribadian dan Mandiri
facebook
youtube
instagram
Program Studi Teknik Industri Terbaik di Medan Sumatera Utara yang Merupakan Jurusan dari Fakultas Favorit di Sumut Yaitu Fakultas Teknik UMA
Call Support 0812-1971-4223
Email Support [email protected]
Location Jalan Kolam No. 1 Medan Estate
Jalan PBSI No. 1 Medan Estate
  • HOME
  • PROFIL
    • AKREDITASI
    • FUNGSIONARIS
    • STRUKTURAL
    • VISI, MISI dan TUJUAN
  • AKADEMIK
    • INFORMASI AKADEMIK
      • AKADEMIK ONLINE
      • E-LEARNING
      • JURNAL TEKNIK INDUSTRI
    • JADWAL AKADEMIK
      • JADWAL KULIAH
      • JADWAL PRAKTIKUM
      • JADWAL KRS
      • JADWAL SEMESTER ANTARA
      • JADWAL UJIAN
        • UTS
        • UAS
      • JADWAL WISUDA
      • JADWAL SEMINAR/SIDANG
    • KALENDER AKADEMIK
    • KURIKULUM
  • AKTIVITAS PRODI
    • KEGIATAN PRODI
    • PRESTASI PRODI
  • MAHASISWA
    • BEASISWA
      • SYARAT DAN KETENTUAN PENERIMA KIP KULIAH
      • BEASISWA BANK INDONESIA (BI)
      • Beasiswa YPHAS Bagi Siswa/I Yang Berprestasi di Sekolah (Ranking I, II dan III)
      • Beasiswa YPHAS Bagi Mahasiswa/I Bersaudara Kandung
    • SISTEM INFORMASI
      • APIK
      • OPAC
      • WEBMAIL
      • DATA MAHASISWA
      • BLOG MAHASISWA
      • JURNAL MAHASISWA
      • AOC
      • ELEARNING
    • PRESTASI MAHASISWA
  • DOSEN
    • PENASEHAT AKADEMIK
    • BLOG DOSEN
    • AKTIVITAS DOSEN
    • PRESTASI DOSEN
    • JURNAL DOSEN
    • AOC
    • DOSEN PRODI
    • TKTD
    • ELEARNING
    • WEBMAIL
    • OPAC
  • ALUMNI
    • TRACER STUDY
    • DATA ALUMNI
    • LAYANAN ALUMNI
    • AKTIVITAS ALUMNI
    • PRESTASI ALUMNI
  • LABORATORIUM
    • INFORMASI LABORATORIUM
    • APLIKASI LABORATORIUM
  • ARSIP
    • SK Mahasiswa
    • DOKUMEN
    • PENGUMUMAN
  • HUBUNGI KAMI

Flow Assurance in Subsea Pipeline Design for Transportation of Petroleum Products

Posted on 26 February 202014 December 2022 by industri
0

Transportation of petroleum products thru pipeline gives extensive risks including wax formation and deposition due to warmth loss of fluids, that is harmful to the waft due to the decreased internal diameter or totally blocked pipelines in intense cases. The manufacturing interruption due to blocked pipelines can motive significant monetary loss. therefore, in order to lessen the ones damaging results, it’s miles vital that pipeline layout for go with the flow guarantee should be taken into consideration. go with the flow assurance is a rather new discipline in oil and fuel industry, it method that the waft of hydrocarbon stream from one factor to some other need to be ensured successfully and economically. even though glide assurance is extraordinarily diverse, encompassing many discrete and specialized topics and bridging Petroleum Products throughout the total gamut of engineering disciplines, our paintings focused basically at the take a look at of wax deposit within the pipelines. the main reason of this paper is to awareness on the thing of material in pipeline layout and the selection of thermal insulation coatings. furthermore, running Petroleum Products parameters which include strain, temperature and flowrate may be tested to reap finest effects. For the case have a look at on this paper, the pipeline connecting Ca NguVang Oilfield’s Wellhead Platform (WHP) to the relevant Processing Platform of Bach Ho Oilfield (CPP-three) in Vietnam might be studied. as a result, this work covers several factors, namely the theoretical take a look at, the modeling the use of Excel as well as using specialized software program OLGA, and subsequently the utility for a actual case inside the petroleum enterprise in Vietnam.
Oil and gas fields in Vietnam are located hundreds of kilometers offshore in which producing and processing processes are separated and performed on specific systems. those systems are linked by using a pipeline device lying on the seabed. in particular, crude oil is transferred from the Wellhead Platform of Ca NguVang discipline to the significant Processing Platform of Bach Ho discipline, where crude oil is under processing, by means of the approximately-25-kilometer-length pipeline (determine 1).

Ca NguVang subject is operated by using Hoan Vu Joint working organization. due to a median reserve, which degrees between 6200 – 20,000 barrels/day [1] , it’s far impossible to broaden this field independently due to financial problems. with a purpose to reduce the Petroleum Products improvement fee, it’s far suggested that Ca NguVang subject need to be related with Bach Ho field by using the subsea pipeline gadget. The produced oil from Ca NguVang field has a excessive concentration of paraffin, which has a tendency to motive wax deposition in pipes.

Crude oil is a mixture of waxes, aromatics, naphthenes, asphaltenes, and resins. At standard reservoir temperatures and strain, wax molecules are dissolved within the crude oil. as the produced oil flows through a subsea pipeline lying on the sea floor, its temperature drops below WAT (Wax appearance Temperature) due to warmness loss alongside the pipeline [2] . Waxes in the oil shape deposits at the internal pipe wall then grow to be thicker with time, which ends up in critical problems Petroleum Products associated with float assurance [3] . within the worst-case scenario, the whole manner of shipping must be stopped for the substitute of the plugged phase of the pipe. The estimated fee might be as much as about $30,000,000 per incident [4] .

In fact, there were some of accidents related to flow warranty which become attributed to wax deposition. From 1992 to 2002, over 50 cases of pipeline blocking due to wax deposition have been said in Gulf of Mexico [5] . in which, the changing price was $5,000,000, with a downtime of 40 days constituted approximately $25,000,000 [6] . one of the maximum excessive instances befell at Staffa area in North Sea, united kingdom [7] . The offshore platform became extraordinarily damaged with the aid of wax deposition; to the point that it became left abandoned at the full value of $one hundred,000,000 [6] .

 

View this post on Instagram

 

A post shared by Teknik Industri UMA (@industri.uma)

Berita
Wisuda Periode I Tahun 2026: Rektor UMA Tekankan Lulusan Harus Mampu Hadapi Perubahan di Era Transformasi Digital
Universitas Medan Area (UMA) kembali menegaskan komitmennya dalam mencetak sumber...
Rektor Universitas Medan Area Buka PMDK Periode 1 Tahun 2026, Bekali Calon Wisudawan Hadapi Dunia Kerja Digital
Universitas Medan Area (UMA) melalui Biro Pengembangan Inovasi dan Karir...
IMTI Prodi Teknik Industri UMA Gelar Workshop Manajemen Mutu ISO 9001: Bekal Karier Profesional bagi Mahasiswa
Medan, 2026 – Dalam upaya meningkatkan kompetensi dan daya saing mahasiswa...

KAITAN UMA

LOKASI FAKULTAS TEKNIK UMA

KAMPUS I :

Jln. Kolam Nomor 1 Medan Estate
Jln. PBSI, Medan 20223
Telepon : (061) 7360168
Call Center : 0811-6013-888

KAMPUS II :

Jln. Sei Serayu No. 70 A, Medan 20122
Jln. Setia Budi No. 79 B, Medan 20122
Telepon : (061) 42402994
Call Center : 0811-6013-888

Silahkan kunjungi juga website Prodi :

  • Teknik Sipil : sipil.uma.ac.id
  • Teknik Elektro : elektro.uma.ac.id
  • Teknik Mesin : mesin.uma.ac.id
  • Arsitektur : arsitektur.uma.ac.id
  • Teknik Informatika : informatika.uma.ac.id

 

Copyright © 2016 - 2026 Prodi Teknik Industri- Universitas Medan Area