Public Procurement of Engineering Works -
Skip to content
Inovatif, Berkepribadian dan Mandiri
facebook
youtube
instagram
Program Studi Teknik Industri Terbaik di Medan Sumatera Utara yang Merupakan Jurusan dari Fakultas Favorit di Sumut Yaitu Fakultas Teknik UMA
Call Support 0812-1971-4223
Email Support [email protected]
Location Jalan Kolam No. 1 Medan Estate
Jalan PBSI No. 1 Medan Estate
  • HOME
  • PROFIL
    • AKREDITASI
    • FUNGSIONARIS
    • STRUKTURAL
    • VISI, MISI dan TUJUAN
  • AKADEMIK
    • INFORMASI AKADEMIK
      • AKADEMIK ONLINE
      • E-LEARNING
      • JURNAL TEKNIK INDUSTRI
    • JADWAL AKADEMIK
      • JADWAL KULIAH
      • JADWAL PRAKTIKUM
      • JADWAL KRS
      • JADWAL SEMESTER ANTARA
      • JADWAL UJIAN
        • UTS
        • UAS
      • JADWAL WISUDA
      • JADWAL SEMINAR/SIDANG
    • KALENDER AKADEMIK
    • KURIKULUM
  • AKTIVITAS PRODI
    • KEGIATAN PRODI
    • PRESTASI PRODI
  • MAHASISWA
    • BEASISWA
      • SYARAT DAN KETENTUAN PENERIMA KIP KULIAH
      • BEASISWA BANK INDONESIA (BI)
      • Beasiswa YPHAS Bagi Siswa/I Yang Berprestasi di Sekolah (Ranking I, II dan III)
      • Beasiswa YPHAS Bagi Mahasiswa/I Bersaudara Kandung
    • SISTEM INFORMASI
      • APIK
      • OPAC
      • WEBMAIL
      • DATA MAHASISWA
      • BLOG MAHASISWA
      • JURNAL MAHASISWA
      • AOC
      • ELEARNING
    • PRESTASI MAHASISWA
  • DOSEN
    • PENASEHAT AKADEMIK
    • BLOG DOSEN
    • AKTIVITAS DOSEN
    • PRESTASI DOSEN
    • JURNAL DOSEN
    • AOC
    • DOSEN PRODI
    • TKTD
    • ELEARNING
    • WEBMAIL
    • OPAC
  • ALUMNI
    • TRACER STUDY
    • DATA ALUMNI
    • LAYANAN ALUMNI
    • AKTIVITAS ALUMNI
    • PRESTASI ALUMNI
  • LABORATORIUM
    • INFORMASI LABORATORIUM
    • APLIKASI LABORATORIUM
  • ARSIP
    • SK Mahasiswa
    • DOKUMEN
    • PENGUMUMAN
  • HUBUNGI KAMI

Public Procurement of Engineering Works

Posted on 24 May 202014 December 2022 by industri
0
The environmental harm bobbing up from the construction and engineering Engineering Work services changed into answerable for the appearance of several norms and resolutions regulating and directing the sector’s overall performance. In this text, we studies how professionals with enjoy in public bids verify the difficulty degree of the implementation of these necessities and the way they examine the environmental regulation concerning the safety and conservation of the surroundings, effect on fees, deadlines and the answer to environmental problems. The results display that industry experts remember as “excessive” the extent of issue to put in force the addressed sustainability necessities, and that the Brazilian environmental legislation does not observe its environmental safety position, increases the possibility of delays and expenses of projects and offerings and hampers the emergence of solutions that would remedy environmental issues.
products and production services require efficient sports that generate sturdy environmental impacts. the development enterprise is singled out by way of the international Council for constructing (ICB) as the human sports quarter that consumes greater natural Engineering Work sources and makes use of strength in an intensive manner, generating huge environmental influences [1] .

“construction has been accused of causing environmental issues starting from excessive consumption of worldwide assets each in terms of production and constructing operation to the pollutants of the encompassing environment” [2] .

The diverse stages of production works have interaction drastically with the surroundings, and can result in vegetation elimination, soil movement (inside the Earthmoving stage), intake of herbal sources for the implementation of concrete factors and waste generation associated with various sports [3] .

in line with Brammer and Walker [4] “the environmental impact of the construction industry might be larger in growing international locations than it is in increase ones, because growing international locations are honestly nevertheless underneath Engineering Work creation, and that they’ve a noticeably low diploma of industrialization, making the construction industry one in every of the biggest sectors impacting on the biophysical environment.”

the construction model practiced in Brazil reasons environmental harm because of the exhaustive usage of non-renewable raw material, the consumption of large quantities of strength, and it is a exceptional supply of waste, thereby causing environmental degradation [5] [6] .

This context makes the insertion of greater sustainable practices within the creation and constructing offerings an object this is normally present in sustainability agendas. in this regard, the movement towards a more sustainable engineering has the government as a key agent, for the reason that it’s miles a main contractor of engineering works and services.

The nation has an crucial role in building and attaining sustainability, acting as the essential contractor of goods and offerings, being able to modify the marketing parameters, inserting and charging for the providers to undertake an economic production eco-green [7] [8] .

thinking about the dimensions and fee of public procurement, sustainable public procurement has the potential to play an vital role in offering social benefits. [4] .

Sustainable procurement enables public Engineering Work institutions to meet the wishes of products, offerings and works thinking about no longer handiest the advantages for the enterprise, society and the economic system, however also the minimization of environmental harm [9] [10] [11] . therefore, the authorities, as well as making sure the bottom charge of their contracts, additionally has the responsibility to mitigate environmental affects via the enforceability of sustainability necessities that must be discovered by folks who participate in bidding tactics.

 

View this post on Instagram

 

A post shared by Teknik Industri UMA (@industri.uma)

Berita
Wisuda Periode I Tahun 2026: Rektor UMA Tekankan Lulusan Harus Mampu Hadapi Perubahan di Era Transformasi Digital
Universitas Medan Area (UMA) kembali menegaskan komitmennya dalam mencetak sumber...
Rektor Universitas Medan Area Buka PMDK Periode 1 Tahun 2026, Bekali Calon Wisudawan Hadapi Dunia Kerja Digital
Universitas Medan Area (UMA) melalui Biro Pengembangan Inovasi dan Karir...
IMTI Prodi Teknik Industri UMA Gelar Workshop Manajemen Mutu ISO 9001: Bekal Karier Profesional bagi Mahasiswa
Medan, 2026 – Dalam upaya meningkatkan kompetensi dan daya saing mahasiswa...

KAITAN UMA

LOKASI FAKULTAS TEKNIK UMA

KAMPUS I :

Jln. Kolam Nomor 1 Medan Estate
Jln. PBSI, Medan 20223
Telepon : (061) 7360168
Call Center : 0811-6013-888

KAMPUS II :

Jln. Sei Serayu No. 70 A, Medan 20122
Jln. Setia Budi No. 79 B, Medan 20122
Telepon : (061) 42402994
Call Center : 0811-6013-888

Silahkan kunjungi juga website Prodi :

  • Teknik Sipil : sipil.uma.ac.id
  • Teknik Elektro : elektro.uma.ac.id
  • Teknik Mesin : mesin.uma.ac.id
  • Arsitektur : arsitektur.uma.ac.id
  • Teknik Informatika : informatika.uma.ac.id

 

Copyright © 2016 - 2026 Prodi Teknik Industri- Universitas Medan Area